FACILITY ACCESS / PUBLIC

PRODUCTION
INFRASTRUCTURE.

46,000+ square feet supporting the controlled movement of apparel from cut components to finished goods.

FACILITY 01 / GREATER NOIDAACTIVE
MC-F01 / GENERAL ACCESS
Moist Corp factory production floor
FIG.PRODUCTION FLOOR / GREATER NOIDA
01FACILITY SEQUENCE

THE FLOOR,
BY FUNCTION.

Production moves through defined areas with oversight at each stage.

MC-F01-CUT
Cutting at Moist Corp
FIG.01 / CUTTING
SECTOR / 01

Cutting

Material preparation and cutting organized against approved production specifications.

MC-F01-PRD
Stitching & production at Moist Corp
FIG.02 / STITCHING & PRODUCTION
SECTOR / 02

Stitching & production

Garment construction managed through the approved sequence and production schedule.

MC-F01-FIN
Finishing at Moist Corp
FIG.03 / FINISHING
SECTOR / 03

Finishing

Finished pieces prepared for inspection, presentation and packing.

MC-F01-QC
Quality control at Moist Corp
FIG.04 / QUALITY CONTROL
SECTOR / 04

Quality control

Inline checks and final inspection applied before finished goods are released.

MC-F01-PKG
Packing & dispatch at Moist Corp
FIG.05 / PACKING & DISPATCH
SECTOR / 05

Packing & dispatch

Packing, documentation and freight handoff coordinated for delivery.

02FACILITY DATA

OPERATING PARAMETERS.

0146,000+ SQ FT

PRODUCTION INFRASTRUCTURE

02<35 DAYS

PRODUCTION CYCLE

0398.0%

ON-TIME DELIVERY

0450 PCS

STARTING MOQ

PROJECT INTAKE / PUBLIC ACCESS

READY TO
BUILD?

ACCEPTING PROJECTS

Submit your production requirements for evaluation by the Moist Corp team.

INITIATE PROJECT
DIRECT CHANNEL